NCNR NG7-SANS Instrument Schedule J. Barker Tel: (301)975-6732 Fax: (301)921-9847, E-mail: barker@nist.gov Instrument Tel: (301)975-5082 Changeover time: 9:30 a.m. -------------------------------------------------------------------------------- Start Num UniqID Date Days Users S-No Experiments Equip Contact ----- ----- ------------------ ------- ------------------------ ----- -------- Jun 19 3 SANS Staff 14260 Summer School rheo Krzywon NIST Jun 22 13 Facility Shutdown Facility Shutdown Jul 5 1 SANS Staff 13529 Calibration NCNR Jul 6 1 A Nakatani (Dow) 17677 SANS experimetns on 10CB Mildner DOW Proprietary Materials Jul 7 2 Summer Visitors TBA 10CB Liu NIST Jul 9 1 P. Lampen, J. 17644 Temperature Dependent DIS Wasbrough Borchers, B. Kirby NIST Magnetic Behavior of Core/Shell Gamma-Fe2O3 Jul 10 1 E Bazilevskaya+S 17455 Regolith production rate 10CB Mildner Brantley (Penn S28-109 depends on the slope State)+ G Rother position: Jul 11 1 D Cole (Ohio 17127 Characterization of 10CB Mildner State)+G Rother S28-14 Nanoporosity in Rocks (Oak Ridge) from Subsurface Jul 12 1 SANS Staff 13530 Feasibility 10CB Krzywon NIST Jul 13 3 AK Gurmon+N Wagner 17252 Study of the SE Liu (UDel) S28-49 microstructure of shear thickening suspensions Jul 16 1 J. Lynn, B. Ueland, 17153 Nature of the SCM Butler O. Vajk, S. Cheong S28-25 Ferroelectric and Magnetic Domains in Jul 17 1 E Bazilevskaya+S 17455 Regolith production rate 10CB Mildner Brantley (Penn S28-109 depends on the slope State)+ G Rother position: Jul 18 1 SHUTDOWN Jul 19 3 M Helgeson (MIT) 17400 Characterizing polymer- 10CB Liu SC28-01 mediated droplet-droplet interactions Jul 22 1 NCNR STAFF 13530 Recover lost time on S28- 10CB Liu NIST 109 + S28-101 Jul 23 3 M Helgeson+ (MIT) 17430 Rheo-SANS investigations rheo Liu S28-101 of yielding in a model colloidal gel Jul 26 3 G Newbloom+ D Pozzo 17393 Investigation of the 10CB Wasbrough (U Washington) S28-86 Conformational Changes of Dissolved Jul 29 2 P Dela Igelsia+ D 17417 Analyzing the Effect of 10CB Wasbrough Pozzo (U S28-94 Solvent on the Formation Washington) of Jul 31 1 SANS Staff 13530 Feasibility 10CB Krzywon NIST Aug 1 2 J. MinKim, R Ndong, 17673 UD Feasibility time 10CB Kline C. Li, D. Greene, NIST Aug 3 3 D Pochan+S 17338 Elimination of branching rheo Liu Sathaye+Others S28-65 in self-assembling beta- (UDel) hairpin Aug 6 1 L Jin (UT-ElPaso)+M 17130 Evaluation of the 10CB Mildner Engle (USGS)+G S28-16 heterogeneity of pore Rother (Oak geometry and Aug 7 1 D Cole+T liu 17127 Characterization of 10CB Mildner (OSU)+G Rother+L S28-14 Nanoporosity in Rocks Anovitz (Oak Ridge) from Aug 8 6 no neutrons REACTOR DOWN NIST Aug 9 2 Aug 12 2 -------------------------------------------------------------------------------- Equipment: 9P:9-Position ambient sample changer; 10CB: 10 Position sample changer (-10 to 100 C); VF: Vacuum Furnace; 7H: 7 Position Heating Block (up to 200 deg C); 7HB: 7 Position Heating Block with BN (up to 300 deg C) HM1:Horizontal High-Field Electromagnet (2 Tesla); HM2:Horizontal Low-Field Electromagnet (0.5 Tesla); DI: Closed Cycle, Displex, refrigerator (10K to 330K); MSC: Minnesota Sliding Plate Shear Cell; BSC: Boulder Couette Flow Shear Cell; SE: Special Environment; NPC: NIST Pressure Cell; SCM: Superconducting Magnet(7 Tesla); 2H: 2 Position Heating Block; VR: Vertical Rotation Stage; Contacts: Paul Butler (x2028), John Barker (x6732), John Barker (x6732) Jeff Krzywon (x6650), Cedric Gagnon (x2020), Michael Zhang (x5513) Yimin Mao (x6017), Yun Liu (x6235), Markus Bleuel (x5165), Susana Teixeira (x4404)