NCNR BT5-USANS Instrument Schedule M. Bleuel Tel: (301)975-5165 Fax: (301)921-9847, E-mail: markus.bleuel@nist.gov Changeover time: 10:00 a.m. -------------------------------------------------------------------------------- Start Num UniqID Date Days Users S-No Experiments Equip Contact ----- ----- ------------------ ------- ------------------------ ----- -------- Mar 6 3 John Barker, Man-Ho Instrument Shakedown, 2H Barker Kim Realignment Mar 9 2 Charlie Glinka Aggregation of modified 2H Barker clay in polymer matrix Mar 11 3 Michael Agamalian Residual stress in SE Kim,Barker Si(220) single crystal Mar 14 2 Mu-Ping Nieh Aggregation of Surfynol 2H Kim,Barker 480 surfactant Mar 16 22 TBA 2H Barker Apr 6 2 Chilled water outage, 2H Barker reactor shut down Apr 8 8 TBA 2H Barker -------------------------------------------------------------------------------- Equipment: HM2: Horizontal Low-Field Electromagnet (1.0 Tesla); DI: Closed cycle, displex, refrigerator (10 K to 330 K); BSC: Boulder Couette Flow Shear Cell; NPC: NIST Pressure Cell; SCM: Superconducting Magnet (7 Tesla); 4H: 4-position heating stage (up to 200C); VR: Vertical Rotation Stage; 6CB: 6-position sample changer (-10 to 100 deg C +/- 0.1 C); 5P: 5-position ambient sample changer; SE: Special Environment; RHEO: Rheometer 301; 12SC: 1-2 plane flow-SANS shear cell; LRM: horizontal low-field electromagnet (0.5T) Little Red Magnet Contacts: Paul Butler (x2028), John Barker (x6732), John Barker (x6732) Jeff Krzywon (x6650), Cedric Gagnon (x2020), Michael Zhang (x5513) Yimin Mao (x6017), Yun Liu (x6235), Markus Bleuel (x5165), Susana Teixeira (x4404)