NCNR NG3-SANS Instrument Schedule P. Butler Tel: (301)975-2028 Fax: (301)921-9847, E-mail: butler@nist.gov Instrument Tel: (301)975-4163 Changeover time: 10:00 a.m. -------------------------------------------------------------------------------- Start Num UniqID Date Days Users S-No Experiments Equip Contact ----- ----- ------------------ ------- ------------------------ ----- -------- Aug 23 1 SANS Staff (NCNR) 13529 Calibration 10CB Gagnon NCNR Aug 24 2 J ODonnell+I El 17426 Microstructure Evolution 10CB Hammouda Hedok (Iowa State S28-99 During Reversible U) Aug 26 1 V. Prabhu 17769 Scattering from 10CB Butler NIST muultiwalled carbon nanotubes Aug 27 4 B Stadler (U Minn)+ 17155 Probing long and short- HM1 Krycka K Krycka (NCNR) S28-26 axis magnetic correlations within Aug 31 5 J Leiner+M 17369 Magnetic Anisotropy in HM1 Krycka Dobrowolska+J S28-77 Fe/GaAs nanowires Furdyna+ X Liu (U Sep 5 2 J Mang (Los Alamos) 17468 Evolution of the 10CB Barker S28-110 Microstructure of a Composite High Explosive Sep 7 3 M Glassman+B Olsen 17418 The Role of Nanoscale 10CB Hammouda (MIT) S28-95 Morphology in the Toughening of Sep 10 1 D Fushman (UMd) 17125 Characterization of 10CB Krueger S28-12 Receptor Recognition by PolyUbiquitin Sep 11 1 T. Perevozchikova TBA 10CB Perevozchikova NIST Sep 12 4 A Allen+L Espinal+W 17259 In situ SANS studies of 7HBP Kline/Hammouda Wong-Ng+C Brown S28-52 CO2/N2 gas selectivity in C (NIST)+C Matranga+J Sep 16 1 R. Ndong 17754 UD Feasibility time 10CB Butler NIST Sep 17 1 J. Barker, Instrumentation test (GC 10CB Barker/Butler J.Krzywon, C. NIST and Si Scattering) + Gagnon feasibilty (night) Sep 18 1 K. Weigandt, R. 18130 Cross-Slot Extensional SE Weigandt/Butle Jones, P. Butler NSOFT Flow Apparatus Feasability Testing Sep 19 2 D Fushman (UMd) 17125 Characterization of 10CB Krueger S28-12 Receptor Recognition by PolyUbiquitin Sep 21 3 L Anovitz+G Rother 17442 Microstructure of SE Kline (Oak Ridge)+D Cole S28-103 confined fluids in (OSU) mesoporous rock matrices Sep 24 2 A.Faraone, D. 17555 SANS measurement of Ezrin 10CB Butler Callaway NIST solution Sep 26 2 J. Borchers, B. 17733 Pinned Spins in SE Krycka Kirby, P. Lampen, NIST Core/Shell Gamma-Fe2O3 K. Krycka Nanoparticles Sep 28 1 R.Jones, W. Chen, 17738 Quantitative Incoherent SE Krycka K. Krycka, J. NIST Background Barker Sep 29 1 K. Krycka 13530 PA SANS Feasibility PA Krycka NIST -------------------------------------------------------------------------------- Equipment: 9P: 9-Position ambient sample changer; 10CB: 10-Position sample changer (-10 to 100 deg C); VF: Vacuum Furnace; 7CB: 7-Position sample changer (-10 to 100 deg C); 7H: 7-Position Heating Block (up to 200 deg C); 7HB: 7-Position Heating Block with BN (up to 300 deg C); HM1: Horizontal High-Field Electromagnet (2 Tesla); HM2: Horizontal Low-Field Electromagnet (1 Tesla); DI: Closed cycle, displex, refrigerator (10 K to 330 K); MSC: Minnesota Sliding Plate Shear Cell, BSC: Boulder Couette Flow Shear Cell; NPC: NIST Pressure Cell; SCMA: Superconducting Magnet (9 Tesla); 2H: 2-Position, high precision heating stage (up to 250 deg C); SE: Special Environment; VR: Vertical Rotation Stage; OC: Orange Cryostat; Contacts: Paul Butler (x2028), John Barker (x6732), John Barker (x6732) Jeff Krzywon (x6650), Cedric Gagnon (x2020), Michael Zhang (x5513) Yimin Mao (x6017), Yun Liu (x6235), Markus Bleuel (x5165), Susana Teixeira (x4404)