7/7/03-7/11/03 Base, detector arm, optical rails, and aperture installation and alignment.
![]()
The three electrical power breaker panels are completed.
![]()
The base shim plate is installed and shutter aperture plate is in place. The theodolite will be used to locate the beam centerline so that the aperture can be machined.
![]()
The Base assembly has been bolted to the floor over the shim plate.
![]()
The 2-theta goniometer is attached to the base assembly.
![]()
The 2-theta arm is attached.
![]()
![]()
The aperture plate is machined, backed with borated Aluminum, and installed.
![]()
A blank aperture insert is used to help set the theodolite. The 2-theta arm, the upstream (shown) and downstream optical rails, and detector platform are aligned. Also, lead ballast has been installed in the counterbalance chamber.
![]()
The detector and shielding are installed. Also shown is the downstream optical rail.
![]()
![]()
![]()
Additional views of the instrument.