5/13/03 - 6/25/03 Site Preparation and Initial Installations
![]()
The AND/R site, showing the outer optical bench (below the shutter), the epoxy floor, the base assembly being put together and tested (placed 90 degrees counter clockwise from its final orientation), and the 2-dimensional Position Sensitive Detector (PSD) taking background measurements.
![]()
Close up view of the outer optical bench and epoxy floor.
![]()
Close up view of the base assembly.
![]()
AND/R's three electrical power breaker panels installed behind the stairs.
![]()
The bridge extension. This will move the stairs forward by ~22" allowing under stairs storage of a dewar that will supply LN2 to three Be filters.