NCNR NG3-SANS Instrument Schedule B. Hammouda Tel: (301)975-3961 Fax: (301)921-9847, E-mail: hammouda@nist.gov Instrument Tel: (301)975-4163 Changeover time: 10:00 a.m. -------------------------------------------------------------------------------- Start Num UniqID Date Days Users S-No Experiments Equip Contact ----- ----- ------------------ ------- ------------------------ ----- -------- Feb 25 1 Feb 26 3 Mar 1 2 Mar 3 2 Mar 5 3 Mar 8 2 Mar 10 2 Mar 12 3 mar 15 2 Mar 17 2 Mar 19 3 Mar 22 2 Mar 24 2 Mar 26 3 Mar 29 2 Mar 31 2 Apr 2 2 -------------------------------------------------------------------------------- Equipment: 9P: 9-Position ambient sample changer; 10CB: 10-Position sample changer (-10 to 100 deg C); VF: Vacuum Furnace; 7CB: 7-Position sample changer (-10 to 100 deg C); 7H: 7-Position Heating Block (up to 200 deg C); 7HB: 7-Position Heating Block with BN (up to 300 deg C); HM1: Horizontal High-Field Electromagnet (2 Tesla); HM2: Horizontal Low-Field Electromagnet (1 Tesla); DI: Closed cycle, displex, refrigerator (10 K to 330 K); MSC: Minnesota Sliding Plate Shear Cell, BSC: Boulder Couette Flow Shear Cell; NPC: NIST Pressure Cell; SCMA: Superconducting Magnet (9 Tesla); 2H: 2-Position, high precision heating stage (up to 250 deg C); SE: Special Environment; VR: Vertical Rotation Stage; OC: Orange Cryostat; Contacts: Cedric Gagnon (x2020), John Barker (x6732), Paul Butler (x2028), Boualem Hammouda (x3961), Susan Krueger (x6734), Steve R. Kline (x6243) Andrew Jackson (x3149), Lionel Porcar (x5049), Mark Laver (x4404),