Run in progress: lofp2 LaOFeP/TMM01/Cava, Cu311,145
(file /home/NCNRWIN/bt1/qing/lofp2005.bt1)
Completed 50 of 201 points
(2theta = 5.25)
Temperature =
134.900
Last data point collected at
03:59:35 AM on Friday, 05/16/08
last point took data collection time 3.30 minutes
(run average 3.30)
Extrapolated remaining run time: 8.30 hours
(or using average 8.31 hours)
finishing at 12:18 PM on Friday, 05/16/08
(12:17 PM 05/16/08 based on last point alone)
(BT1STATUS 12/2000)